Acquiring Fire Certificate/Permit
Steps to Acquire a Fire Certificate/Permit
- 
                                    Request for inspection and submit the following to the Fire Department (each with dimensions):
                                    
- Site Plan
 - Block Plan
 - Floor Plan
 
 - Inspection of Project/Building by Fire Department.
 - Present Fire Engineering drawings to the Fire Department.
 - Apply for Fire Certificate/Permit from the Fire Department.
 - 
                                    The Fire Department operates a Risk-based system. Projects are categorized as:
                                    
- Low Risk Projects
 - Medium Risk Projects
 - High Risk Projects
 
 - 
                                    Turnaround time for most projects (Low Risk) is five (5) days.
Issued by Fire Safety Directorate. 
                                
                                For more information or assistance, please contact the Fire Safety Directorate.
                            
                        
                            Sample Fire Certificate
